COVID-19 UPDATE We are working through how we can safely open our public facilities in Level 2. Please click here for full details.
Skip to content

Building Utilities Enquiry

Note

We try to maintain a 3-5 day wait for site inspections. However, at times of high workloads this can be up to 6-8 days. For current inspection wait times or to book an inspection please contact our call centre – 0800 492 452 between 8am and 5pm Monday to Friday.

Information
  • Onsite septic tank/wastewater requirements
  • Onsite stormwater requirements
  • Onsite drinking water storage requirements
  • CCTV of council pipes for building projects
  • Geotechnical requirements for building
  • Flooding and minimum floor level requirements for building.
Top