September 2024 - The Raglan Wharf boat ramp is undergoing an upgrade with a new reinforced concrete surface being overlaid.  The scope sees the upgrade done in halves so the ramp remains open at all times.  The first concrete pour was successfully completed on 23rd August which saw half the width at 5.5m wide by the entire of 37m length poured which is now curing. 

The second of two concrete pours took place mid-September, curing is taking place with the ramp expected to be fully open in early October.

 