Skip to content

Search

Refine Your Search
1300 search results for "Long Term Plan"
Sort by
  1. pdf

    demand over the short terms (1-3 year period), medium term (3-10 year period) and long term (10-30 year, the importance of the continued operation and ongoing use of the site over the long term. ...

  2. pdf

    as a long term possibility and should not be allowed to be precluded by development, but does not seem likely to eventuate in the short to medium term. A rail siding for freight at the Whangarata, ...

  3. pdf

    on the Remuneration Authorities Long Term Proposal for Local Government Agenda Item 5.2 The report, Long Term Proposals for Local Government be approved. CARRIED on the voices P&R1709/04 4 Wa...

  4. pdf

    -statutory document that provides a long term planning framework for the future development, an approximately 400m long gravel driveway, the entry to which is sealed. The site covers approximately...

  5. pdf

  6. pdf

    Ion, signed off the ‘end of term’ September 2016 Policy & Regulatory Committee Minutes, and earthwork provisions of the District Plan. Granted J K Waterson LUC0413/16 39 Long Street, . Granted ...

  7. pdf

    iP Links, we can easily place cameras to covet any areas of concern, so long as power

  8. pdf

    Community Art Centre Incorporated for a term of 20 years, with a further right of renewal for 15, periods especially on the long weekends, but with good marketing and promotions we were still able...

  9. pdf

    use this term it means the same 16 November 2015 document. [5] Where we refer to the ‘Decision, that required an RMA intervention. He also stressed that the wording of the Act means that as long, ...

  10. pdf

    use this term it means the same 16 November 2015 document. [5] Where we refer to the ‘Decision, that required an RMA intervention. He also stressed that the wording of the Act means that as long, ...

  11. pdf

    - Consideration of the long-term effects on the adjoining residential property and persons located at 15, block wall along the road frontage of Wellington Street it is 35.7m long and has a maximu...

  12. pdf

  13. pdf

    is recommended that the term ‘Industrial Zone Heavy’ in this heading and throughout the rest of the PWDP, are appropriate to provide clarity and a link to the definition of this ‘gfa’ term. 657. ...

  14. pdf

    ) The Minister must publicly notify every application for— (a) alease; or (b) a licence for a term

  15. pdf

    on native fish and habitats in the short term during construction works and in the long term, headwaters, the Kairoa Stream is approximately 9.5km long with approximately 3.5km (37%) upstream, 16...

  16. pdf

    and habitats in the short term during construction works and in the long term if in-stream structures form, Stream is approximately 9.5km long with approximately 3.5km (37%) upstream of the SPA b...

  17. pdf

  18. pdf

    and an accountability statement has been completed. viii. Applications for Long Term Plan grants should, of wireless iP Links, we can easily place cameras to covet any areas of concern...

  19. pdf

    proposal were the geohazard not to be addressed. A geohazard is a broad term that refers to natural, the eastern part of the study area. Many of the back scarps are in excess of 50 metres long

  20. pdf

    the long-term and large scale warfare often referred to as ‘The Musket Wars’ that had occurred over, , continued Lot 1 DPS 85309 (Figure 23 - Figure 25) This is a long narrow lot that runs from ...

Download the Antenno app

Use the Antenno app to tell us about things that need our attention, like potholes, graffiti, or broken streetlights.

More about Antenno

Top